Création de nouveaux bassins et d’un Check Dam
0 Comment
In the village of Maharaja, we are building 3 small water retention basins. We are also in the process of creating a check dam as well as another small traditional dam. The ground that we clear from the digging of the dams is used to raise the surrounding of the arable lands in order to contain rain water more easily...Read More
Le mot du président
Returning to Bargarh at the beginning of June, I noted that the Indian Rain Drop team has a very good contact with the local population. Ashok, Bablu and Ramesh have undertaken everything they promised. They tested several kinds of vegetables during the dry season to determine which have the most success. Ashok is also very enthusiastic to test SRI, a...Read More
L’avancée des travaux à Bargarh
Ashok, Bablu and Ramesh have quite advanced. The trees of the plant nursery have grown considerably! The sprinklers are installed and the trees do not stop growing. Ramesh already sold 250 trees, is increasing the grounds for the plantations and has built a small office in order to manage the fruitful project. Most of the drip irrigation systems have been installed and...Read More
Vallauris-Bargarh, communiquons grâce aux dessins
Superbe échange de dessins et de photos entre l’école Langevin 2 de Vallauris et les enfants de l’école de Bargarh Toute la classe de Bargarh s’est réunie pour vous présenter leurs dessins ! [slideshow_deploy id=’444′]